The Weekette Logo

The Weekette
Ghost Hunt Risk Mitigation Worksheet

If you ruin The Weekette all you get is a lousy pen.

The Weekette / Planning / Ghost Hunt Risk Mitigation Worksheet

Ghost Hunt Risk Mitigation Worksheet

Section Menu

Activity Tools
Meal Tools
Theme Tools
Scheduling Tools

Description:Teams will use the geocaching boxes and clues they find along the way to find D-bar-A's most haunted spots.
Program:Scouts BSA, Order of the Arrow
Adjusted Hazard:IIIE (Improbable, Marginal)
Mitigation Decision:Acceptable with Review
Prepared:2024-11-30 by Doug Wilson


Hazard Cause / EffectCorrective Actions
Hazard DescriptionCauseEffectInitial Risk RatingPossible Controlling MeasureClosing CommentsStatusFinal Risk
Hypothermia / FrostbiteExposure to cold temperatures over a prolonged period.Camper develops a condition which requires first aid or medical attention.IIICEnsure proper preparedness of participants prior to activity. Those who are unprepared must remain in cabin.IIIE
Hypothermia / FrostbiteExposure to cold temperatures over a prolonged period.Camper develops a condition which requires first aid or medical attention.IIICMonitor weather conditions and if they are not conducive to outdoor activities, change the location, reduce the duration of the even, or change to a different event which is better suited to the weather.IIIE

Historical Context: We have not yet held this event, but will use our standard safety protocols and mitigations to make it as safe as possible.

Based on Location: O Timing: D Category: Challenge

Return to the Ghost Hunt details.


There is additional functionality on this page if you are logged into the site.